Northamptonshire Case Study

An example of an upgraded backup generator system

Background
  • Site visit to understand the scope of the work necessary.
  • Old analogue system that was difficult to maintain.
  • Wasn’t fit for purpose
  • Full of risk
  • Obsolete parts
  • Didn’t have good process visibility in the way of alarms or events
Tailored Specification
  • Make use of the existing containerised engine and alternator but with new control system integrated into the existing LV distribution system.
  • Factory Acceptance Test (FAT) showing all the control functions and full cause and effect of the entire integrated system.
  • New control cabinets for all three generators and LV network changeover systems.
Installation

Carried out with no disruption to the business by scheduling the work in a time efficient and flexible manner.